Engineering surveying for dams, bridges and major structures

We measure displacement and deformation of structures where errors are not an option. We have worked on dams in Serbia, Republika Srpska (Bosnia and Herzegovina) and Tajikistan, and on the Freedom Bridge in Novi Sad.

ČEKAEnglish copy for phase 2, including the director's methodology text.

Dam monitoring

Periodic precise measurements of the dam body and its surroundings against a stable reference network, with a report for every measurement cycle.

Bridge and structure monitoring

Displacement and deflection measurements on bridges and other structures, periodically and during load testing.

Methodology

Stable reference points outside the zone of influence, the same method and instruments in every cycle, rigorous adjustment and accuracy assessment before a movement is reported as movement.

References

Totalna stanica na stubu referentne mreže iznad akumulacije brane Grančarevo
PeriodičnoInženjerska geodezija

Oskultacija brane Grančarevo

Trebišnjica, Republika Srpska

42.7487° N, 18.4886° E

Period
ČEKAGodine ciklusa merenja.
ciklusi merenja
ČEKABroj ciklusa.
Status ČEKAInženjerska geodezija

Precizna geodetska merenja na brani Rogun

Vakhsh, Tadžikistan

38.6983° N, 69.7719° E

Period
ČEKAPeriod angažovanja.
naša uloga
ČEKAKratko, na primer „referentna mreža“.
Status ČEKAInženjerska geodezija

Oskultacija brane Paljuvi Vis

Kladnica, Ub

44.3896° N, 20.1137° E

Period
ČEKAPeriod.
ciklusi merenja
ČEKABroj ciklusa.
Status ČEKAInženjerska geodezija

Oskultacija brane Prvonek

Banjska reka, Vranje

42.5365° N, 21.9916° E

Period
ČEKAPeriod.
ciklusi merenja
ČEKABroj ciklusa.
PeriodičnoInženjerska geodezija

Osmatranje Mosta slobode

Novi Sad

45.2543° N, 19.8601° E

Period
ČEKAGodine osmatranja.
osmatranja
ČEKABroj osmatranja.

Tell us what needs measuring

We reply on working days. For tenders and larger projects, let us arrange a meeting.